About this project

This project was executed using the design-build delivery method with Gray Construction. This 60,000sf, two-story, tilt-up concrete building is used to house biological manufacturing processes including offices, shipping/receiving, laboratories, chemical warehousing, etc. Four unique laboratories were programmed and designed to facilitate and optimize operations. A separate hazardous materials storage building was also designed and permitted separately so as to not delay construction. 

    Project Details

    Owner
    Eurofins Operon

    Construction Value
    $9,500,000

    Size
    60,000sf

    Services Provided
    Architecture
    Engineering
    Interior Design

    Delivery Method
    Design-Build with Gray Construction

Bring your architectural challenges to our world-class team.