---
title: Wright Patterson Air Force Base, 711th HPW Consolidation Master Plan
description: The design was prepared as a Task Order under an IDIQ A/E design contract for the 88ABW, Civil Engineering Group at Wright-Patterson AFB. Luckett & Farley was tasked with updating the Human Effectiveness (Human Performance Wing, “HPW”) Master Plan to replace a 2006 pre-BRAC master plan.
image: https://www.luckett-farley.com/hubfs/government-design-studio/wright-patterson-airforce-base-711-hpw-consolidation-master-plan.jpg
---

[![LuckettFarleyLogo.png](https://www.luckett-farley.com/hs-fs/hubfs/logo--full.png?width=207&height=57&name=logo--full.png "LuckettFarleyLogo.png")](https://luckett-farley.com)

This is a search field with an auto-suggest feature attached.

- There are no suggestions because the search field is empty.

## Wright Patterson Air Force Base, 711th HPW Consolidation Master Plan

Dayton, Ohio

** Jun 25, 2020 10:49:57 PM / by [Luckett & Farley](https://www.luckett-farley.com/case-studies/author/luckett-farley)

### ABOUT THIS PROJECT

We prepared the design as a task order under an IDIQ A/E design contract for the 88ABW, Civil Engineering Group at Wright-Patterson AFB. Luckett & Farley was tasked with updating the Human Effectiveness (Human Performance Wing, “HPW”) Master Plan to replace a 2006 pre-BRAC master plan. Updating the plan included documenting space, infrastructure and adjacency requirements of the HPW, and providing concepts for the consolidation of administrative, laboratory, and support functions. HPW functions are currently dispersed in facilities throughout Area B at Wright-Patterson AFB. The facilities vary in degree of physical condition and adequacy to serve the HPW needs. The current conditions create inefficiencies and limit collaboration. Consolidation will facilitate “net-centric” research, improve delivery time, lower costs in developing products, and speed up integration and delivery of training programs.

The results of the plan concluded a need for over 153,000 SF of facilities to be constructed in three phases over a nine-year period at a projected cost of approximately $67 million.

### Project Details

**Owner**

Wright Patterson Air Force Base

Services Provided

Master Planning

Architecture

Engineering

Check out more of our projects

[Boone Tavern Restaurant and Bar

](https://www.luckett-farley.com/case-studies/boone-tavern-restaurant-and-bar)

[Saga Spirits Distillery

](https://www.luckett-farley.com/case-studies/saga-spirits-distillery)

[UofL J.B. Speed School of Engineering Student Success Center

](https://www.luckett-farley.com/case-studies/uofl-student-success-center)

[Bardstown Aquatic & Sports Center

](https://www.luckett-farley.com/case-studies/bardstown-aquatic-sports-center)

[Churchill Downs

](https://www.luckett-farley.com/case-studies/churchill-downs)

## Unsure if your current space can meet the demands of your changing business needs?

[ Let's talk. ](https://www.luckett-farley.com/meet-with-us)

© 2026 Luckett & Farley | [Site Information](https://www.luckett-farley.com/site-info) | [Site Map](https://www.luckett-farley.com/sitemap)

[**](https://twitter.com/luckettfarley) [**](https://www.linkedin.com/company/luckett-%26-farley-architects-and-engineers) [**](https://www.facebook.com/luckett.farley.1853/) [**](mailto:info@luckett-farley.com)

[**](https://www.luckett-farley.com/case-studies/wright-patterson-air-force-base-711th-hpw-consolidation-master-plan#)