7 project photos

About this project

Luckett & Farley provided full architectural and engineering services, including feasibility study, for the expansion and renovation of St. Matthews Fire District Station Two facility on Brownsboro Road.

Previously, Station Two was approximately 8,100 SF and was sharing space with the Harrods Creek Fire District. The objectives of this project were to identify an appropriate location for the fitness and weight training area that was previously located within Apparatus Bays, expand the living quarters to accommodate twenty-four beds, increase the locker, laundry and shower facilities, enlarge the kitchen and dietary support areas, and provide a separation between the dining and the recreation areas. A second-floor space was created above the new ambulance bay for meeting and conference space.

The final design focused on two key features; development of an efficient layout that allows as much of the existing footprint to remain intact, limit the amount of new construction and focus on the additions maintaining the current aesthetic of the building while also providing an increase in daylight and the quality of space.

Additional design elements include exterior bearing walls constructed of CMU materials with brick cladding matching existing facility, rubber and sealed concrete flooring, LED lighting throughout facility, independent HVAC system, exposed structure ceiling, new drains and water supply for laundry equipment, exterior patio, new commercial ceiling fans, full tiled bathroom and showers, and new kitchen.

    Project Details

    Owner
    St. Matthews Fire District

    Size
    2,100 SF Addition
    8,100 SF Renovation

    Construction Value
    $1,300,000

    Date
    2017

    Services Provided
    Architecture
    Engineering
    Interior Design

Bring your architectural challenges to our world-class team.

Contact Us

More projects like this

  • Are you an architectural,
    engineering or interior design All-Star?

    Join Us