Push Your Limits

Share

Kentucky design firm adds new services and wins more work with BIM and Autodesk Revit software


 

Luckett & Farley created as-built drawings from the point cloud.


By: AutoDesk

The Firm
Founded in 1853, Luckett & Farley is the largest architectural firm in Kentucky and one of the oldest continuing design practices in the United States. Today, the employee-owned, multidisciplinary firm offers clients in the public and private sectors a broad range of services, including architecture, engineering, interior design, and construction management. A key component of the firm’s success is its commitment to technology.

“We like to think of ourselves as a technology company that solves complex infrastructure and design problems for our clients,” says Gregory Buccola, SE, LEED AP BD+C, structural services market director at Luckett & Farley. That’s why the firm has standardized on Building Information Modeling (BIM) for all new projects. “Our CEO is a strong believer in the benefits of BIM.” The firm’s design tool of choice is Autodesk® Revit® software, included in Autodesk® Building Design Suite Premium and Ultimate, which combines BIM, CAD, and visualization software tools in a single suite.

The Challenge
Luckett & Farley engineers recently had an opportunity to push the limits of their expertise with BIM. “A long-standing client approached us with a problem,” says Buccola. “To meet OSHA requirements, they needed to reconfigure a series of maintenance platforms and ladders within a steam chamber at their manufacturing facility.” The interior of the chamber was a dark and complex web of structural steel, piping, and equipment
that made development of an accurate set of as-built drawings quite difficult.

Time was short on the proposed project. “Every day that this chamber was not operational cost our client millions in revenue,” says Buccola. As a result, Luckett & Farley had only two opportunities to enter the chamber before preparing construction documents. Contractors responding to the RFP would have no opportunity at all to verify existing conditions. “They would have to rely entirely on the accuracy of our designs when preparing their bids.”

The Solution
With only three weeks between the creation of as-built drawings and the beginning of construction, Luckett & Farley had to work quickly. “It became very clear that the only way to ascertain all of the as-built conditions and produce a realistic set of drawings was to perform a 3D reality capture,” says Buccola. “That was really the only way to convey all of the constraints to the contractors and allow them to produce bids that did not contain premiums for ambiguity.”

Truescan 3D, a sub-consultant, performed the actual 3D laser scan of the chamber. “In two sessions, they scanned the entire inside and outside of the chamber and created a point cloud containing literally millions of data points,” says Buccola. Luckett & Farley input the point cloud file into Autodesk Revit to produce an easy-to-understand 3D model of the chamber.

Creating as-built drawings from this model was a quick process. “Using Revit, we could slice, dice, and manipulate the model to understand the composition of the chamber,” says Nick Eckhart, vice president of design technologies & innovation at Luckett & Farley. Within four days of creating the model, Luckett & Farley had accurately represented about 80 percent of the chamber, including the structural steel, surrounding overhead shield, walls, piping, and drive shafts.

The Result
“With help from BIM, Autodesk Revit, and point cloud technology, we were able to put together accurate construction documents and meet our client’s schedule,” says Buccola. The precision of those documents helped the client put the project out to bid without worrying about having to shut down the plant again for the contractor to verify existing conditions. “We could not have done this project in any other way without significantly impacting the overall process.”

The firm’s proficiency with BIM and Revit has helped it offer new services, including Scan to BIM services. “We could not have offered that service without Revit, BIM, and point cloud technology,” says Buccola.

Better Quality—More Work
“The ability to win work is our biggest challenge,” says Eckhart. “BIM and Autodesk Revit help us improve design quality and better convey design intent during the bid process and beyond, into the project itself. That enables us to secure more work and to receive early buy-in from our clients once a project begins.”

Share

Related Posts

Materialuscious: Louisville Real Estate Edition

Louisville's Real Estate professionals talk local trends and insights

Recently I asked several Louisville Real Estate professionals about what trends they’re seeing locally and issues specific to landlords and tenants. While Louisville seems to be experiencing similar trends as others in our region, we did receive interesting feedback from a few interviewees regarding the development of downtown Louisville and its impact on the entire city. Top Issues for Landlords The top [more...]

Helping Rural Hospitals Reduce Health Care Costs

Facility Master Planning with Evidenced-Based Design

While there is still considerable uncertainty surrounding the overall impact of healthcare reform on the future of the industry, controlling cost and enhancing the patient experience are top of mind for the leadership of many organizations.  Planning ahead and evaluating future capital expenditures present unique opportunities to rein in costs while improving the overall quality [more...]

Angel’s Envy: Story of a Design Concept

Passion, excitement (and a little bourbon) inspire a unique design process

Representatives from Louisville Distlling Company asked Luckett & Farley to submit a concept and proposal for a new microdistillery in downtown Louisville, Kentucky. The facility was intended to be the new home to a rising star in the world of bourbon, called Angel’s Envy. The brand’s story to stardom is as good as the product itself. To manifest the story into [more...]

Design considerations for the nursing mother

Don't forget to add this space in your floorplans

In 2010, a federal law amended “the Fair Labor Standards Act (FLSA) of 1938 (29 U.S. Code 207) to require an employer to provide reasonable break time for an employee to express breast milk for her nursing child for one year after the child’s birth. The employer is not required to compensate an employee receiving [more...]

Never Events Never Again

The Role of Evidenced Based Design

When a person goes to receive medical care, they typically enter with a level of anxiety. One thing that’s usually not on their mind at the time is, “Will I become a victime to a patient fall or trauma? Will a foreign object be left inside my body if i need surgery?” or “Will I get a [more...]

Small Projects, Big Relationships

In the words of the Greek orator, Demosthenus, “Small opportunities are often the beginning of great enterprises.” Great concept, but how do we implement his sage advice? While searching for some answers, I decided to look at our company’s Core Values.  Do our Core Values apply to each & every project – even the small [more...]

North American auto companies focus on their people

Employee passion is contagious and the results speak for themselves.

American car companies and A/E firms have one thing in common.  People.  Sure, there are probably a few other things they have in common.  They both build and design objects that shape our lives, but I would argue that it’s the value they place on their employees that brings them together. I recently visited the [more...]

Emergency Department Design – Evidence-Based Outcomes Drive Design

Part Two

Hospitals are the subject of much study in the architecture and design world of late.  Evidence strongly suggests that there is a direct connection between the hospital environment and patients’ perception of the quality of care received.  That connection is also true for hospital staff, who report that the physical environment of the hospital directly [more...]

Prev 0123 Next