Electrical Engineering

Our electrical engineering staff utilizes advanced technology and software to create design solutions with energy efficiency, practicality and owner usability in mind. Our professional credentials include PE, LEED AP, Lighting Certified (LC) Professional, and Registered Communications Distribution Designer (RCDD).

Our electrically design professionals routinely create solutions for the following:

  • Building and Site Power Distribution Systems
  • Medium Voltage Substations and Distribution (overhead and underground)
  • Standby and Emergency Power Systems
  • Lighting Systems – Daylighting, Advanced Lighting Controls, Site Lighting
  • Life Safety/ Fire Alarm Systems
  • Sustainable Energy Systems
  • Telecommunications – Data Centers, Structured Cabling Systems
  • Security Systems – Access Control, CCTV
  • Audio/Visual Systems - Paging, CATV, Nurse Call, Synchronized Clock Systems
  • Facility Assessments

Related Projects

Clear Channel Communications iHeartradio Theater

This project included the complete demolition and renovation of a 5,800sf ground-level space for a new live performance studio in downtown Manhattan, New York. The space is located directly over the NYC subway system, which posed specific design considerations for vibration and low frequency noise control. The performance area slab was remediated to receive a [more...]

Clear Channel Communications Office & Studio Renovation

Luckett & Farley provided services for this project located in a historic building that was formerly an AT&T headquarters. It is now the new home of Clear Channel’s New York FM operations, a complex consisting of 29 studios. Five stations occupy 120,000 square feet of the second, third and fourth floors. Three of the stations [more...]

Aspen Creek

Luckett & Farley provided site, structural, architectural, mechanical, plumbing and electrical design services for Aspen Creek Restaurant in Fayetteville, North Carolina, This restaurant was modeled conceptually in 3D and developed for construction documents utilizing Revit building information modeling software. The facility supports approximately 100 diners and a full service kitchen with multiple hoods, cooking, food [more...]

Commonwealth Office of Technology Data & Computing Center

  The computer center serves multiple users throughout the Commonwealth, including the police and the lottery. Recent computer purchases have nearly exhausted the UPS and HVAC infrastructures. Luckett & Farley was commissioned to assess the existing equipment and make recommendations for upgrades to provide redundancy and accommodate future computer purchases. Initial recommendations were: Remove office [more...]

Shawnee Library Addition and Renovation

Luckett and Farley provided architectural and engineering services for  the renovation of and addition to the Shawnee Branch of the Louisviile Free Public Library.  The project calls for the creation of “an inspiring Community Gathering Place, a building welcoming to all age groups, a flexible and sustainable building,” and “a building that fosters creativity.” The [more...]

University of Louisville Papa John’s Cardinal Stadium Football Training Facility

The training facility, designed and constructed at the same time as the new football stadium, includes the following features: A 9,600sf Strength Training A 5,500sf Rehab Area 120 Team Lockers 3 Practice Fields Academic Hall for Student Athletes UofL Football Hall of Fame Head Coach’s Office, Recruiting Lounge & Players’ Lounge

University of Louisville Jim Patterson Baseball Stadium

A new baseball stadium was designed for the University of Louisville. Sited near the football stadium, also designed by Luckett & Farley, it is a popular facility for the team and fans. Areas of the stadium include: 1,500 seat capacity, expandable to 2,500 seats Artificial turf playing surface including base paths Chair-back seating Concessions areas [more...]

KIA Training Center

Luckett & Farley provided design services for a new 70,000sf training center that includes classrooms and lab space for instruction programs in industrial systems technology, Programming Logic Computer systems technology (PLC), robotics technology, and machine tool technology. Also included in the facility is a multi-purpose conference center to accommodate 500 persons, and a media/resource center.  [more...]

Ticona Plastics New Headquarters and Research Development

Luckett & Farley provided master planning and space planning studies for the relocation of Ticona’s headquarters and R&D facilities from New Jersey to Kentucky. Following the master planning, costing and approval phase, Luckett & Farley provided A/E design and construction administration services for the 125,000sf building that was added to an existing manufacturing site. The [more...]

Louisville Metro Government Metro Development Center Green Roof

Luckett & Farley provided design services for Louisville Metro’s first green vegetative roof. On the Metro Development 444 South Fifth Street building, this project replaces the existing built up roof on an early 20th century building with an extensive low maintenance green roof utilizing 160 tons of gravel, planting medium, trees and over 10,000 indigenous [more...]

Prev 01234 Next

Related Posts

LED Lighting

Making the Season Bright (and Green)

Light-emitting-diode (LED): a semiconductor diode that emits light when an electric current is applied in the forward direction of the device, as in the simple LED circuit. The effect is a form of electroluminescence where incoherent and narrow-spectrum light is emitted from the p-n junction in a solid state material. Sound a bit confusing? You’re [more...]

Assessing Your Potential Assets

Location and purchase price aren't the only important aspects to puchasing a new building...

A strange consequence of this disappointing economy we’re experiencing has been the immense activity seen in the Commercial and Industrial markets. The advent of competitive lease rates has forged increased movement from companies finding it wise to either relocate or purchase a building. Like the housing market, the cost of purchasing (even with the improvement [more...]

Prev 0 Next